Insiders Project
Season 1, Episode 3: Top of Kyiv's South Bridge
Select Source
The shooting crew follows through the internal constructions of the South Bridge. Having passed the whole bridge inside, the team goes up vertical cables 300 meters long. A hand-made construction for ascent, strong arms and self-confidence - these are the only things the team relies on. Throwing a climbing hook with a rope, the shooting crew gets to the peak using a hand-made ladder.
All Episodes - Season 1
Episode 1
The house with the star
Episode 2
Underground tunnels of Arsenal factory
Episode 3
Top of Kyiv's South Bridge
Episode 4
Cold War bunker
Episode 5
Construction cranes cemetery
Episode 6
Abandoned Kyiv Metro tunnels
Episode 7
Mechanical engineering plant "Bolshevik"
Episode 8
Ancient underground river
Episode 9
Chornobyl Exclusion Zone
Episode 10
The dead city of Pripyat